NTD," Conducting launch status check. Verify status to resume count and go for launch
OTC "Go"
TBC "Go"
PTC "Go"
LPS "Go"
Houston Flight "Go"
MILA "Go"
STM "Go"
Safety Console "Go"
SPE "Go"
LRD "Go"
SRO "Go"
CDR "Go"
NTD - "Launch Director, NTD is ready to proceed".
Launch Director - "mtntrdr welcome to the forum, you have the ball".
__________________
2005 SMB RB 4x4 6.0 PSD
A rocket on the pad is safe,
but it's not what rockets are built for.
|