Oh you guys.....
Well, the last few weeks have been filled with ups and downs, long hours, battling a cold, flying solo and doing double duty with the wife out of town...again.
Still pushing towards making the journey to Baja, maybe leaving a day or 2 later than planned and with a few things left unfinished if it happens at all, but hoping the majority of the interior will be done by the end of this week. Then there’s the task of packing everything back into the van plus provisions.
We installed the 2nd battery on the drivers side where the propane tank sat and ran the crossover. Here’s the new #1 battery going into the original location with all new cables with a new circuit breaker that did not exist before.
Anyway, Matt was able to sort the tangle of electrical mess and make things look like a proper DC panel, it turns out there was a lot of runs that were spliced together or not properly routed and a second fused distribution block was needed.
There’s a bit going on here...
The wall panels are back in after running all the electrical, the lower cabs are in and it’s ready to get scanned for the upper cab back wall contours. We worked on getting the water system together and I managed to cut in a big hole for the Espar D2
I forgot to put in the foam gasket! It’ll get fixed tomorrow
Upper cab design will be finalized and hopefully cut and put together and maybe installed tomorrow, that will be a huge step.