Re: SOCAL build
Plumbing is done, just wrapping up wiring, lasting thing to order is the solar panel and battery then I have to test everything.
Next will be getting a few dents banged out and rhino lining the bottom of the van exterior.
With that finished I will take it to have ceiling, walls and flooring done by a upholstery shop, this will just be grey carpet and the rubber coin flooring. After that I will go a local cabinet maker or similar craftsman and have the cabinet and shelves that will house electrical and hide plumbing built, bench\bed built and any little custom wood work. Nothing too fancy, just some basic storage and a place to sleep. With that done back to upholstery guys for covering.
Then I will button up the electrical and plumbing, wrap up the exterior with so $ spent at Aluminess.
|