Killingtime
Advanced Member
So I sold my 4x4 E350EB with the CCV top to my buddy- and I haven't heard the end of it yet from my wife and kids...
Soo- I had been lurking around until I found this new girl in WV. She needs some work, but a solid platform to work off of.
08 Express EB w/6.0 gasser and factory Quigleys independent front end with a SMB top installed in AZ.
The top was leaking and the original interior had been torn out and the new started back when I purchased it. I realized quickly that the work that had been done was not to my standards, so I am currently still removing and reworking what we will have for the interior.
SO FAR-
I've ordered about 8k worth of parts and they are slowly rolling in and the project really getting going. New 3" lift, new tires/wheels, bumpers and steps, lights, awnning, fridge, air fryer, invertor, dinnette, and more!
-1st thing I did was find the leak on the top, removed all the old racks and hardware, replaced it all with new Stainless bolts and re-fiberglassed 80% of the top. It's now time to sand it out and install the new RV ceiling coating to be done.
-Then I installed new thermal insulation up top and new lighting in the top.
-Next is working out the cabinets, final design is done(in my head) now just putting it together,so far so good.
-I went with propane fridge this time. Learned after 2 dc fridges on my last one that they don't work well.. Installed 5.5 propane tank on the underside.
-Lots more happening but for now- here is a few picsw..
Soo- I had been lurking around until I found this new girl in WV. She needs some work, but a solid platform to work off of.
08 Express EB w/6.0 gasser and factory Quigleys independent front end with a SMB top installed in AZ.
The top was leaking and the original interior had been torn out and the new started back when I purchased it. I realized quickly that the work that had been done was not to my standards, so I am currently still removing and reworking what we will have for the interior.
SO FAR-
I've ordered about 8k worth of parts and they are slowly rolling in and the project really getting going. New 3" lift, new tires/wheels, bumpers and steps, lights, awnning, fridge, air fryer, invertor, dinnette, and more!
-1st thing I did was find the leak on the top, removed all the old racks and hardware, replaced it all with new Stainless bolts and re-fiberglassed 80% of the top. It's now time to sand it out and install the new RV ceiling coating to be done.
-Then I installed new thermal insulation up top and new lighting in the top.
-Next is working out the cabinets, final design is done(in my head) now just putting it together,so far so good.
-I went with propane fridge this time. Learned after 2 dc fridges on my last one that they don't work well.. Installed 5.5 propane tank on the underside.
-Lots more happening but for now- here is a few picsw..