Visited the van yesterday to check on build progress. The upstairs furring strips are in and the silicone adhesive is dry.
The electrical plan and access bays are mapped out.
Choosing fabrics wasn't easy, but it's sure nice to pick from lots of pretty options.
Jeff had some great updates to the design. To make it easy to add new devices in the future, he's making a wiring channel from the electrical bay to the driving cab. He refined the galley design to fit more fresh water. He also planned access panels for the electrical bays, so that we'll be able to service everything. It's really fun to work with a creative problem solver.
For more information and pictures, check out our blog post here:
http://www.advanturetrek.com/2012/01/build-update/
Stay tuned for more updates. Things will happen fast in the next few weeks. Next week, the electrical, subflooring, furring, and insulation will be complete.