I'll document some of the work since purchasing on the 4th of July weekend.
Installed a Weatherguard 3063 Pack Rat Bed Drawer Unit.
Insulated the ceiling.
Installed 200w Renology solar system.
Reclaimed redwood planks on the ceiling.
Create a queen bed platform (that I intend to improve upon).
(soon i'll learn how to embed more photos into a post than just than just the 5 attachments allowed)
Next up is mood lighting and upholstering the walls.