Haha! Thanks, guys!
Chipping away.... Things are going pretty fast! Hoping to be finished by the beginning of November for a road trip.
Honestly, the pace things are going, I don't see why I can't finish it in time.
Shower is framed in (not pictured).
The front wall where the sink and fridge with the mini split is almost done. Tomorrow it will be finished, other than cabinets. I plan on doing all the cabinets at once.
PEX is done for the sink and shower, electrical for the fridge and 110v outlet is plumbed.
All I need it putty, and paint. The short wall by the door is framed. I didn't take a pic of it yet. I will when I'm finished.
__________________
2014 Ford E-350 SRW Box Truck
1983 Jeep CJ7
|
|
|
12-23-2022, 02:06 AM
|
#52
|
Senior Member
Join Date: May 2017
Location: Lafayette, La
Posts: 206
|
Shower and ceiling is in.
__________________
2014 Ford E-350 SRW Box Truck
1983 Jeep CJ7
|
|
|
12-23-2022, 03:39 AM
|
#53
|
Senior Member
Join Date: Nov 2016
Location: FL and VA
Posts: 1,959
|
Coming along nicely.
__________________
Chris
2008 GMC 3500 Quigley Weldtec 4x4 Savana SMB
|
|
|
12-23-2022, 08:55 AM
|
#54
|
Senior Member
Join Date: Aug 2019
Location: Elk Grove, CA
Posts: 391
|
Quote:
Originally Posted by 225
After messing around with a Raspberry Pi running Venus OS software, I have a Cerbo GX with a 7" touchscreen for about $100 instead of $600.
|
How about some more info on this? It sounds fascinating.
Nice work on your ceiling, etc.
__________________
Bob
2005 E350 Super Duty Ext Wheelchair Van
2002 Itasca 35U Motorhome
|
|
|
12-24-2022, 07:07 AM
|
#55
|
Senior Member
Join Date: Jul 2011
Location: TN
Posts: 10,275
|
Dig that ceiling!
|
|
|
07-08-2023, 02:26 AM
|
#56
|
Senior Member
Join Date: May 2017
Location: Lafayette, La
Posts: 206
|
Haven't been doing much, but starting back again. I'm trying to finish the box, so I can start on the 4WD conversion.
The first thing I needed was window tint for the cab. I was dying. I have 50% ceramic on the door windows, and clear ceramic on the windshield, with a 5% brow.
I had my Fiamma awning off the old van, but it ended up still going with that deal. However, I was going to get another Fiamma, but they were backordered. And the price has gone up a good bit.
Being that this is a box truck, and I have flat walls, I went with a traditional RV awning. It's powered, it automatically stops on the retract and extend. I added LED lights under the awning too. And it's a lot cheaper than a Fiamma, and doesn't need legs.
Added a Propane bottle mount for the on demand hot water heater:
__________________
2014 Ford E-350 SRW Box Truck
1983 Jeep CJ7
|
|
|
07-08-2023, 02:30 AM
|
#57
|
Senior Member
Join Date: May 2017
Location: Lafayette, La
Posts: 206
|
I have 1,000 watts of solar on the roof rack. I built 4, 280ah lithium batteries totaling 1120ah of batteries. SmartPlug RV 30 amp power inlet, and also a future inlet for Starlink.
3k inverter/charger, DC to DC charger, MPPT, Cerbo GX w/ 7 inch screen, 2 - Lynx Distributors.
The bed will go on top of this. On the other wall will be the 40 gallon water tank.
__________________
2014 Ford E-350 SRW Box Truck
1983 Jeep CJ7
|
|
|
07-08-2023, 08:12 AM
|
#58
|
Senior Member
Join Date: Jul 2013
Location: So Cal
Posts: 4,095
|
Quote:
Originally Posted by 225
I have 1,000 watts of solar on the roof rack. I built 4, 280ah lithium batteries totaling 1120ah of batteries. SmartPlug RV 30 amp power inlet, and also a future inlet for Starlink.
3k inverter/charger, DC to DC charger, MPPT, Cerbo GX w/ 7 inch screen, 2 - Lynx Distributors.
|
Built from 280ah cells?......nice! 200A BMS?
Are you running one 30A Orion?
__________________
2008 E350 RB passenger 4WD SMB penthouse
2013 KTM 350 EXC
2008 KTM 250 XCF-W
2003 Honda Element
|
|
|
07-08-2023, 08:49 AM
|
#59
|
Senior Member
Join Date: May 2017
Location: Lafayette, La
Posts: 206
|
Quote:
Originally Posted by boywonder
Built from 280ah cells?......nice! 200A BMS?
Are you running one 30A Orion?
|
Thanks. The cells are 280ah Docan Power cells, with Overkill Solar 120a BMS's, cases are from Alibaba. It comes out to about $800 per unit.
And it's the 30a Orion. I have the plug to setup EV charging as well. I doubt I'm going to install it. I was checking on charging stations, and I don't think it will be worth the hassle.
__________________
2014 Ford E-350 SRW Box Truck
1983 Jeep CJ7
|
|
|
07-08-2023, 09:20 AM
|
#60
|
Senior Member
Join Date: Apr 2013
Location: San Francisco, CA
Posts: 3,288
|
Nice!
What are modes of charging are feeding the Lith bank?
I see:
A single 30a DC to DC from the alternator
and 120A from the Multiplus drawing from shorepower/ generator / EV charger
What model MPPT unit are you feeding the 1000w solar array through?
__________________
Ray
Beastie 3: 2002 7.3 EB Cargo: Agile TTB, CCV High Top, Custom Walk Through, Lots of stuff added. www.BlingMyRig.com
|
|
|
|
|
Posting Rules
|
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts
HTML code is Off
|
|
|
|
» Recent Threads |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|