Ok so finally finished my work contract so had some time again
I got interior shelves done and the dudes laminated and t molding done
Been too long since I had time.
__________________
2002 E250 5.4 4R70W 2wd 3.5 inch lift Pleasure-Way Traverse on 16x8 with 265/75/16's
Got my shop cleaned up. No more wood deal with now
I made some corner braces for the door the mounted door frame part of my galley box. I wanted to really stiffen it up and since the galley box will be supported by it.
I've been putting of taking the door panel ..
Going to get the hinges installed table top etc.
After that I'll have to start it ..
__________________
2002 E250 5.4 4R70W 2wd 3.5 inch lift Pleasure-Way Traverse on 16x8 with 265/75/16's
Thanks I have been stalled on this for a long time, waiting to find the hinges I want to use .. I have them now , they are stainless lift off hinges. I have a plan for the rest now and will be working on it after I recuperate for a bit..
__________________
2002 E250 5.4 4R70W 2wd 3.5 inch lift Pleasure-Way Traverse on 16x8 with 265/75/16's
A few more pics
Top is mounted now as is the pop up table.
The hinges auto lock with spring mechanism and have a button underneath to unlock them.
I may put built cup holder
__________________
2002 E250 5.4 4R70W 2wd 3.5 inch lift Pleasure-Way Traverse on 16x8 with 265/75/16's